GTS Energy Solutions ...
MTN Cameroon Energy Optimization Programme | GTS Energy Solutions
Powering the Towers — Energy and Management Service SolutionsLimbe, Cameroon · +237 650 427 347
Five-phase practical rollout

MTN Cameroon Energy Optimization Programme

A low-risk Energy-as-a-Service programme designed to reduce diesel consumption, lower operating expenditure, improve network power resilience and support MTN Cameroon’s Project Zero ambition.

25–45%diesel reduction potential
24/7remote monitoring
2040net-zero alignment
MTN Cameroon Energy Optimization Programme overview

Prepared by Global Technology Services (GTS) · Energy-as-a-Service for telecom tower infrastructure.

Executive value proposition

Measured operational value without high upfront deployment risk

The programme connects sustainability targets with immediate operational benefits through a phased, verified and performance-based delivery model.

01

Lower fuel exposure

Reduce generator runtime and diesel dependence using optimized solar, storage, grid and generator dispatch.

02

Improved resilience

Increase power availability through hybrid architecture, live monitoring, preventive maintenance and clear escalation procedures.

03

Performance-based scale

Assess, pilot and validate results before wider deployment, allowing MTN to scale only after performance is demonstrated.

Garoua Switch reference case
Reference case

Garoua Switch validates the technical case

The 2024 solar-hybrid installation under Project Zero prioritized daytime solar self-consumption while maintaining grid or diesel fallback. The reference case demonstrates that hybrid energy solutions can operate effectively in Cameroon’s power environment.

72.12 MWhsolar energy generated
19.47 tCOâ‚‚eemissions avoided
US$11,279estimated savings
✓On-grid solar PV connected to national grid.
✓Hybrid generator and battery integration with energy-efficient HVAC upgrades.
Implementation pathway

Five-phase rollout from baseline to network scale

Each phase reduces uncertainty and creates the verified evidence required for the next investment decision.

PHASE 1 · 2–4 WEEKS

Assessment

Audit 2–5 representative sites, establish baseline consumption and prioritize pilot locations.

PHASE 2 · 4–8 WEEKS

Pilot

Deploy advanced hybrid controllers on 1–2 sites and test under real operating conditions.

PHASE 3 · 6–10 WEEKS

Optimization

Fine-tune system parameters using measured operating, load and energy-source data.

PHASE 4 · ONGOING

Monitoring

Provide 24/7 remote visibility, alarms, reporting and performance management.

PHASE 5 · 12–36+ MONTHS

Scale-up

Expand across the network only after technical and financial performance is verified.

KPIs and financial impact

Fuel savings converted into verifiable business value

The illustrative financial model uses a baseline of 1,500 litres of diesel per site per month at XAF 850 per litre.

Illustrative savings per site

375–675 Ldiesel saved monthly
XAF 318,750–573,750monthly cost savings
XAF 3.83–6.89Mannual cost savings
25–45%target diesel reduction

Actual savings will depend on verified site baselines, load profiles, grid availability, equipment condition and the final technical design.

Diesel consumption reductionVerified monthly
Renewable energy contributionMeasured by source
Network power availabilitySLA tracked
COâ‚‚ emissions avoidedReported periodically
Monitoring and reporting performanceAuditable records
Governance and service discipline

Risk management reinforced by a clear SLA

Risk controls

  • Equipment performance and integration testing
  • Baseline definition and verified savings calculations
  • Preventive and corrective maintenance procedures
  • Remote alarms, incident monitoring and escalation
  • Defined governance and reporting responsibilities

Service Level Agreement

24/7 monitoring
Live site visibility and alarm response.
Maintenance
Preventive and corrective interventions.
Verification
Measured performance against approved baselines.
Reporting
Agreed timelines, escalation and resolution.
Digital enablement

TOpti Tower Optimization App

TOpti moves tower energy management from isolated manual audits to a data-driven, end-to-end workflow covering baseline assessment, system sizing, commissioning, live monitoring, maintenance, optimization and EaaS settlement.

Assess
Site surveys, loads, grid status and diesel baseline.
Design
PV, battery, generator and inverter sizing scenarios.
Monitor
Solar, grid, battery, generator, fuel and alarms.
Optimize
Dispatch logic and diesel-reduction recommendations.
Maintain
Work orders, technicians and service history.
Verify & Report
Savings, KPIs, COâ‚‚, SLA and settlement reports.
Assess → Size → Design → Approve → Install → Commission → Monitor → Optimize → Verify
Immediate next steps

Move from proposal to site-level evidence

Ready to establish the first verified baseline?

Engage GTS to commence Phase 1 assessment and pilot-site selection.

Contact GTS
Scroll to Top